[Pro] Need help, behind schedule.

I’ve built my website using FWP but took it over to DW to do some work and got the code to get the thumbnails to enlarge exactly like this when you click on the image http://www.bodylingerie.com/Vinyl-Zip-Front-Corset-Set-P7965.aspx but had some problems getting it uploaded through my Control Panel on Host Gator. All the directories were lined up correctly but the pictures weren’t showing up…anyways…I went back to Freeway and desperately need to know if there is an action that will do this exactly like the link enclosed. I have a code to do this but I don’t believe you can tweek the html in Freeway. Any help showing me how to accomplish this in FW would be greatly appreciated.
Kevin


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Well, there goes any hope of productivity for the day.

Yes, you can do this, easily and entirely within Freeway. Get over to Weaver’s Action emporium and get one of the Lightbox Actions. There’s a paid one and a free one, and they both work very well.

http://www.coastalrugs.com/Actions

Walter


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Thanks, Walter.lol Productivity has resumed.


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Productivity has resumed.

Not here it hasn’t!


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Productivity has stopped again.

I installed the action but it doesn’t work. I’m given a message when I try to preview it telling me I have to do something that I don’t understand. Anymore suggestions?
Thanks.


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

telling me I have to do something that I don’t understand.

Tell us what message you are getting and we will try and help.

David


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

And which action you are using - moo:slimbox?

D


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Here you go. This is the message I got. Actually posted the message here. http://i509.photobucket.com/albums/s331/ckdontes/Screenshot_10.png


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

I’m sorry…the action was lightbox.


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

OK - add the Protaculous Page action

Page>Actions>Protaculous

If you dont have it you can get it at http://www.actionsforge.com/actions/view/18-protaculous

And once you have added it - try again


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Okay, still not getting it. I downloaded the action you gave and tried again but it still isn’t working. When I preview the page and click the image nothing happens. I’ll just walk you through it so you can tell me if I’m doing something wrong. I select the thumb on my page then select item/image/pic to lightbox image. In the actions box for pic to lightbox image I select the full size image. I don’t check anything else in that box. Only because I wasn’t quite sure what to do with Protaculous I selected Page/Page Actions/Protaculous (the only actions section it’s located is in the Page Actions). I then previewed in Browser. Hope that makes sense. Any help would be greatly appreciated. Thanks.


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

I went with what you had asked the moo:slimbox…works like a charm. Thanks.


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options

Glad you got it sorted. moo:slimbox is the one I use, the only caveat is that it clashes with protaculous which is use by a lot of the built in FW actions like Attention FX, Sound FX and Transition FX so they cannot co-exist on the same page.

D


freewaytalk mailing list
email@hidden
Update your subscriptions at:
http://freewaytalk.net/person/options